Skip to content
Tower Restoration Phase 2
The tower looks sturdy but is badly in need of maintenance
Entrance before restoration
Cracked concrete foundation
Catwalk railing deemed beyond repai
A National Park Service grant enabled restoration
NPS support acknowledged onsite
First step - industrial staging
Staging with enclosure
Consultation with engineer and contractor
Special order replacement bricks
Bricks cracked and displaced
Damaged bricks removed
Damaged bricks and mortar replaced
Bricks beneath catwalk removed for access to underside of platform
Bricks beneath platform replaced
Interior brickwork stabilized
Ventilation ball lifted
Ventilation ball lowered
Ventilation ball repaired and replaced
New paint!
Scaffolding removed
Bottom ready to paint
Tower painted
Back to Top